Posted on: July 2, 2020 Posted by: admin Comments: 0

JSS 55555 SPECIFICATIONS IN DETAIL PDF

JSS SPECIFICATIONS IN DETAIL EPUB – RELATED SPECIFICATIONS Joint Services Specifications JSS Revision No. In such cases. Up to °C+/- 3°C JSS IS , 5 to Hz, G JSS , (c) The detailed specifications of environmental stress screening capabilities are. For more details, refer Procedure 6, Test Condition K, Page no of Refer Test No, Page no of Defence Standard JSS

Author: Daizshura Tygotilar
Country: Romania
Language: English (Spanish)
Genre: Environment
Published (Last): 25 April 2007
Pages: 333
PDF File Size: 3.17 Mb
ePub File Size: 9.57 Mb
ISBN: 903-3-32191-169-7
Downloads: 57856
Price: Free* [*Free Regsitration Required]
Uploader: Gojora

In such cases the details shall be as given in the relevant.

The following Test is carried out on product. Features Super Structure The super structure is built using GI frames with anti-corrosive coating and profiles to support the pipelines. The super structure is built using 555555 frames with jss specifications in detail coating and profiles to support the pipelines. Each main header pipe will have pressure gauges along with strainer to protect the nozzle blocks from dust particles.

  KYANI COMPENSATION PLAN 2015 PDF

JSS SPECIFICATIONS IN DETAIL EPUB

The Driving rain test facility is divided into multiple zones. The Driving rain test facility is made of Brick wall up to 1 meter height on two sides with special foundation.

Control Station The main control station is provided in the control room. Header Pipes All the nozzles are mounted on the header pipes which in turn is connected to the main header pipe.

All the nozzles are mounted on the header pipes which in turn is connected to the main header pipe. The control panel jss specifications in detail of all the electrical switchgears and operating instruments needed for a smooth operation of the Driving rain test facility. Powder coated MS super structure is used for long life.

The nozzles can be easily removed for revalidating the pressure. The operation of these zones is as per the requirement of JSS Reinforced concrete test bed with a Degrees gradient towards centre and load on capacity of up to 1 to 1. The main control station is provided in the control room.

  BOURREE BACH TAB PDF

The sprayed water is recirculated through a water channel, passing through a filtration system and returns to the main water sump. Zones The Driving rain test facility is divided into multiple zones.

Test Space Test Bed: A closed loop water circulation system consists of industrial grade pumps for the discharge of specificationx.

Jss specifications in detail Shower Area No. The centre of the test bed have a water channel with a MS grated covering. The control station consists of a stand-alone IP55 protected control cum operating panel.

Water Recirculation System A closed loop water circulation system consists of industrial grade pumps for the discharge of water. Overview Features Technical Specifications. The width of the zpecifications structure can be adjusted and one side of the structure can be moved on guided wheels.

Categories:

Leave a Comment